New-build:

Fishing Centre, Steinach

Developer
Hochbauamt Kanton St. Gallen
9001 St. Gallen, Switzerland

Architect:
Aeschlimann Hasler Partner Architekten AG
8045 Zürich, Switzerland

Year of construction
2015-2017

Construction costs
CHF 12.4 million

Planning contract
• Excavation
• Conceptual design for building and timber construction
• Structural design

Project description
The new fishing centre was built near the shores of Lake Constance. The basement was built as a solid construction and is used as a pump cellar. Most of the building is single-storey and is made of wood. The two-storey part has a solid-construction ground floor and an upper floor made of wood. As a result of the high groundwater level, the excavation of the cellar was carried out with the aid of a sheet pile retaining wall.

YouTube aktivieren?

Auf dieser Seite gibt es mind. ein YouTube Video. Cookies für diese Website wurden abgelehnt. Dadurch können keine YouTube Videos mehr angezeigt werden, weil YouTube ohne Cookies und Tracking Mechanismen nicht funktioniert. Willst du YouTube dennoch freischalten?