New-build
Fishing Centre, Steinach
Developer
Hochbauamt Kanton St. Gallen
9001 St. Gallen, Switzerland
Hochbauamt Kanton St. Gallen
9001 St. Gallen, Switzerland
Architect:
Aeschlimann Hasler Partner Architekten AG
8045 Zürich, Switzerland
Year of construction
2015-2017
Construction costs
CHF 12.4 million
Planning contract
• Excavation
• Conceptual design for building and timber construction
• Structural design
Project description
The new fishing centre was built near the shores of Lake Constance. The basement was built as a solid construction and is used as a pump cellar. Most of the building is single-storey and is made of wood. The two-storey part has a solid-construction ground floor and an upper floor made of wood. As a result of the high groundwater level, the excavation of the cellar was carried out with the aid of a sheet pile retaining wall.