New-build

Vögelinsegg housing development, Speicher

Architect
Hubert Bischoff, Architekt BSA
Plätzli 468, 9427 Wolfhalden

Timber contractor
Blumer-Lehmann AG
Erlenhof, 9200 Gossau

Year of construction
2016-2017

Planning contract
Engineering work for timber construction in the SIA phases
• 32 Construction project
• 51 Execution project
• 52 Execution

Project description
The three multi-family houses with a total of 29 residential units have been designed entirely as timber constructions. The building shell consists of a standardised timber frame construction and a wooden facade cladding. All floor slabs were designed with a wood-concrete composite system.
The staircase and lift shaft consist of cross-laminated timber panels and a second supporting shell for the vertical load transfer of the floor slabs. Here a modern timber construction was created that meets all requirements.